After two weeks of ripping, roaring, stripping, filling, sanding and painting, the remodeled mud room and bath room are almost finished. There are travertine tile floors, apple green walls, freshly painted woodwork, and a new bench in the mud room. A mirror and a few pictures are needed to make it look complete. Even at this stage, it certainly looks better now, don't you agree?
The small bathroom has been a challenge: it is only 48" long and 41" wide, with 10 foot ceilings and a large window. Some idiot built a cabinet off center behind the toilet, so it was painted to match the walls but the cabinet still shows. After hemming and hawing about why the shelf unit behind the toilet was off center, and how it would bother this symmetrical person every time I entered the small space, it was removed yesterday, meaning drywalling and taping took place. Meaning it isn't done yet. Meaning it will need a few more days. The bathroom mirror was unwrapped and a dent in the frame was found so it will need to be returned. Soon you will be able to view the completed bathroom, but not today. Here's just a small peek to keep you interested. Love the color ..... it is deep and dramatic.
Tuesday, October 14, 2008
Subscribe to:
Post Comments (Atom)
2 comments:
Pretty green! I'm doing some painting today in my new condo and am working with Benjamin Moore Jalapeno Pepper... a bit different than your apple color, but those bright greens always look fresh.
Mitch and I did our living room in Brookside Moss (another Benjamin Moore / Pottery Barn color just like Jalapeno Pepper) and we absolutely love it. Green is such a great color!
Post a Comment